CA WATER COMMISSION: Merced River Watershed Flood MAR Study

Kamyar Guivetchi, Manager of DWR’s Division of Planning has often referred to Flood Managed Aquifer Recharge (or Flood MAR) as a “moon shot” for recharging depleted groundwater basins, but just how much Flood MAR can contribute to groundwater recharge in a watershed is unknown.  However, the Department of Water Resources’ Integrated Watershed Management staff is underway with a pilot study to look at the potential for Flood MAR in the Merced River watershed.

At the October meeting of the California Water Commission, Mr. Guivetchi and David Arrate, Senior Water Resources Engineer with the Department of Water Resources, gave a presentation on the study and shared some of the preliminary results.

Click here to read this article from Maven’s Notebook.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.